150 Cheapside

back to list
Client Carillion Construction
Architect Michael Aukett Architects
Construction period 2007 – 2008

150 Cheapside is located in the centre of London opposite St. Paul's Cathedral and it was completed in 2008.

The facade on Cheapside is a naturally ventilated, double building facade, and the single-glazed outer facade is supported by steel rods. The technical design of the facade panels is dominated primarily by the large width of 9 metres.

JORDAHL® supplied anchor channels JTA for connecting the glass facade elements.

back to list